Mar 10, 2011


Edgewater Announces Drill and Trench Results from the Enchi Gold Project, Ghana

Vancouver, British Columbia. Edgewater Exploration Ltd. ("Edgewater" or the "Company") is pleased to announce initial diamond drill hole assays and additional trench results from the Company's on-going multi-rig, 12,000m drill program on the Enchi Gold Project ("Enchi or the Project") in Ghana. The first phase of drilling is targeting near-surface gold mineralization, with average drill intercepts being 50-75m from surface. The targets for this phase of drilling are three of the 16 known gold zones at Enchi including the Nyamebekyere, Boin, and Sewum gold systems.

Initial near surface diamond drill intercepts continue to be consistent with results from previous operator Red Back Mining ("Red Back") including 2.74g/t gold over 9.0m from drill hole KBDD002 located on the southwest portion of the Boin Gold Zone ("Boin"). The Boin gold system has a known strike length of over 10km identified by soil geochemistry. Edgewater currently has one drill operating on Boin with plans to add additional rigs. Drill hole NBDD001 located on the Nyamebekyere Gold Zone ("Nyam") intercepted 1.25g/t gold over 8.0m including 1.13g/t gold over 15.0m. Nyam has been traced over 1600m and is part of a continuous 15km strike length of gold prospects on the Project from Nyamebekyere southwest through Kojina Hill to Sewum Hill in the south. To date, a total of 29 holes have been drilled and 15 trenches completed with assays from 9 drill holes and 11 trenches at Enchi. (See Drill Location Map Here)

Trench results conducted on the Nyambekere Gold Zone, also successfully encountered consistent widths of gold mineralization, including 1.17g/t gold over 20.0m from NBTR004 and 1.14g/t gold over 10.0m including 1.48g/t gold over 8.0m from trench NBTR005.

George Salamis, President and CEO stated: "The fact that we are consistently intersecting shallow zones of mostly oxidized gold mineralization over several hundred meters of strike length supports our view that the gold systems on the Enchi project are laterally extensive with tens of kilometres of gold-in-soil anomalies and gold-bearing structures to be explored. These new results are showing remarkable consistency in relation to zones previously identified by Red Back Mining. In fact, the evolution of Red Back's Chirano and what Chirano looked like in its early stages of exploration, is remarkably similar to what we are seeing at Enchi in terms of geology, grades and gold mineralized thicknesses in host rock." Mr. Salamis adds: "These recent results give us added confidence that we will be able to end our drill program later this year with Enchi's first resource estimate in-hand."

In this first phase of drilling, Edgewater's drill program consists of 2 drill rigs operating on a 24/7 basis. The phase one program is designed to define and expand multiple zones of gold mineralization which were identified by the previous operator Red Back. A total of 42,000m of drilling was conducted previously by Red Back on Enchi, which is comprised of eight licenses totalling 568km2.

As planned, Edgewater's drilling program is beginning to define the extents of the company's Enchi Gold Project, specifically on the three main gold zones Boin, Nyambekeyere, and Sewum.

Boin Gold Zone
717m of HQ diamond drilling has been completed in 8 holes covering <10% of the known strike length of the Boin gold zone as previously defined by Red Back. These initial results are consistent with previous intercepts which demonstrated consistent widths of mineralization over a continuous 10km strike length. We are beginning to get a better understanding of the structural controls and distribution of gold mineralization at Boin. Results received to date for Edgewater drilling and trenching include:

Table 1 - Boin Drill Results

Hole No

Section

From

To

Interval

Au g/t

KBDDH002

4050N

32.0

41.0

9.0

2.74

KBDDH002

4050N

55.0

59.0

4.0

1.9

KBDDH002

4050N

62.0

67.0

5.0

0.85



Table 2 - Boin Trench Results

Trench No

Section

From

To

Interval

Au g/t

KBTR028

4100N

18.0

22.0

4.0

1.69

KBTR028

4100N

38.0

42.0

4.0

0.87

KBTR029

4250N

2.0

13.4

11.4

0.7

KBTR029

4250N

16.0

33.0

17.0

1.07

KBTR031

4050N

0.0

18.0

18.0

0.81

 

Inc

12.0

18.0

6.0

1.67

KBTR032

4000N

26.0

34.0

8.0

1.23

KBTR033

3950N

28.0

45.0

17.0

0.62

KBTR034

3850N

14.0

32.0

18.0

1.41



Nyambekeyere Gold Zone
1879m of shallow diamond drilling has been completed in 21 holes covering 35% of the known 1600m strike length identified by Red Back in their past exploration work. Results received to date for Edgewater drilling and trenching include:

Table 3 - Nyambekeyere Drill Results

Hole No

Section

From

To

Interval

Au g/t

NBDDH001

15280N

35.0

43.0

8.0

1.25

NBDDH001

15280N

47.0

61.0

14.0

1.13

NBDDH002

15320N

11.0

15.0

4.0

0.94

NBDDH002

15320N

30.0

36.0

6.0

0.57

NBDDH003

15200N

32.0

39.0

7.0

0.78

NBDDH003

15200N

55.0

62.0

7.0

1.68

NBDDH004

15160N

19.0

22.0

3.0

1.11

NBDDH004

15160N

25.0

37.0

12.0

0.65

NBDDH004

inc.

26.0

29.0

3.0

1.26

NBDDH004

15160N

47.0

52.0

5.0

0.90

NBDDH007

15400N

33.0

39.0

6.0

1.76

NBDDH007

15400N

43.0

47.0

4.0

0.71

NBDDH008

15500N

35.0

42.0

7.0

1.10

NBDDH008

15500N

46.0

56.0

10.0

0.84



Table 4 - Nyambekeyere Trench Results

Trench No

Section

From

To

Interval

Au g/t

NBTR002

15160N

20.0

26.5

6.5

1.26

NBTR003

15240N

5.0

9.0

4.0

0.87

NBTR003

15240N

12.0

22.0

10.0

2.34

NBTR004

15320N

26.0

46.0

20.0

1.17

NBTR005

15600N

2.0

10.0

8.0

1.48

NBTR005

15600N

14.0

24.0

10.0

1.14



Sewum Gold Zone
Sewum is host to three separately defined gold mineralized structures, each in excess of one kilometre in length. All three of these highly prospective areas are hosted along a key sedimentary-volcanic contact, and host similar geology to Kinross Gold Corporations Chirano Gold mine (5 million oz) located along the Bibiani Shear Zone 70km northeast of the Project.

Sewum South, over a kilometre in length, has been defined by extensive trenching with trench assays of up to 1.14g/t over 24.2m (SWTR038) and 2.35 g/t over 11m (SWTR045). The zone has not been drilled and remains open on strike.

Sewum Central, again over a kilometre in length, has also been trenched in the past with trench assays showing impressive widths of up to 221m @ 0.70g/t. This zone has been tested by wide spaced, shallow drill holes with the best previous drill intercepts assaying 17m @ 1.06g/t gold (SWRC016).

Sewum North: This zone has only been trenched and drilled sporadically over a + 1km strike length, with the best trenches assaying 50m @ 0.88g/t (SWTR001) and 7m @ 4.65g/t (SWTR008) and the best drill intercepts returning 17m @ 1.86g/t (SWRC027).

These zones have not been followed up with drilling since 2006. Edgewater is planning 3000m of drilling to be conducted in the Sewum area, and is currently preparing for mobilization with road and access upgrading.

Sample analyses have been conducted at independent commercial facilities SGS Labs in Tarkwa Ghana. All sample analyses was completed using industry standard geochemical and fire assay practices and included a rigorous Quality Assurance / Quality Control (QA/QC) program consisting of the insertion of standards, blanks and duplicate samples randomly into the sample stream. A review of the QA/QC results shows no significant bias and all results are considered highly reliable.

Mr. Gregory Smith, P.Geo, the Vice-President of Exploration of the Company, is the Qualified Person as defined by NI 43-101, and is responsible for the accuracy of the technical data and information contained in this news release.

About Edgewater Exploration Ltd.

Edgewater is a mineral exploration company focused principally on acquisitions, advancement and development of precious metal properties. Edgewater is currently developing the Enchi Gold Project in Ghana, West Africa and the Corcoesto Gold Project in northwest Spain.

On behalf of the board of EDGEWATER EXPLORATION LTD.

George Salamis,
President and CEO

For further information, please contact:
Ryan King, Vice President
rking@edge-water.com
Telephone: (604) 628-1012

"Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Hole No

Section

Type

Zone

From

To

Interval

Au g/t

NBDDH001

15280N

drill hole

Nyam

35.0

43.0

8.0

1.25

NBDDH001

15280N

drill hole

Nyam

47.0

61.0

14.0

1.13

NBDDH002

15320N

drill hole

Nyam

11.0

15.0

4.0

0.94

NBDDH002

15320N

drill hole

Nyam

30.0

36.0

6.0

0.57

NBDDH003

15200N

drill hole

Nyam

32.0

39.0

7.0

0.78

NBDDH003

15200N

drill hole

Nyam

48.0

49.0

1.0

2.17

NBDDH003

15200N

drill hole

Nyam

55.0

62.0

7.0

1.68

NBDDH004

15160N

drill hole

Nyam

19.0

22.0

3.0

1.11

NBDDH004

15160N

drill hole

Nyam

25.0

35.0

10.0

0.72

NBDDH004

15160N

drill hole

Nyam

47.0

52.0

5.0

0.90

NBDDH005

15000N

drill hole

Nyam

70.0

71.0

1.0

0.68

NBDDH006

14960N

drill hole

Nyam

61.0

62.0

1.0

0.89

NBDDH006

14960N

drill hole

Nyam

77.0

79.0

2.0

0.97

NBDDH007

15400N

drill hole

Nyam

33.0

39.0

6.0

1.76

NBDDH007

15400N

drill hole

Nyam

43.0

47.0

4.0

0.71

NBDDH008

15500N

drill hole

Nyam

35.0

42.0

7.0

1.10

NBDDH008

15500N

drill hole

Nyam

46.0

56.0

10.0

0.84

KBDDH002

4050N

drill hole

Boin

32

41

9

2.74

KBDDH002

4050N

drill hole

Boin

55

59

4

1.9

KBDDH002

4050N

drill hole

Boin

62

67

5

0.85

 

 

 

 

 

 

 

 

Trench No

Section

Type

Zone

From

To

Interval

Au g/t

KBTR028

4100N

Trench

Boin

18.0

22.0

4.0

1.69

KBTR028

4100N

Trench

Boin

38.0

42.0

4.0

0.87

KBTR029

4250N

Trench

Boin

2.0

13.4

11.4

0.70

KBTR029

4250N

Trench

Boin

16.0

33.0

17.0

1.07

KBTR029

4250N

Trench

Boin

37.0

41.0

4.0

0.78

KBTR030

4150N

Trench

Boin

20.0

22.0

2.0

0.75

KBTR031

4050N

Trench

Boin

0.0

18.0

18.0

0.81

KBTR031

4050N

Trench

Boin

26.0

28.0

2.0

2.63

KBTR031

4050N

Trench

Boin

40.0

42.0

2.0

0.65

KBTR032

4000N

Trench

Boin

26.0

34.0

8.0

1.23

KBTR033

3950N

Trench

Boin

8.0

10.0

2.0

0.83

KBTR033

3950N

Trench

Boin

28.0

45.0

17.0

0.62

KBTR034

3850N

Trench

Boin

2.0

6.0

4.0

0.61

KBTR034

3850N

Trench

Boin

14.0

32.0

18.0

1.41

NBTR002

15160N

Trench

Nyam

20.0

26.5

6.5

1.26

NBTR003

15240N

Trench

Nyam

5.0

9.0

4.0

0.87

NBTR003

15240N

Trench

Nyam

12.0

22.0

10.0

2.34

NBTR004

15320N

Trench

Nyam

26.0

46.0

20.0

1.17

NBTR005

15600N

Trench

Nyam

2.0

10.0

8.0

1.48

NBTR005

15600N

Trench

Nyam

14.0

24.0

10.0

1.14

 
 

You can view the Next News Releases item: Thu Mar 17, 2011, Drilling Continues to Expand Near Surface and At Depth Gold Mineralization on Edgewater's Corcoesto Gold Project, Spain

You can view the Previous News Releases item: Tue Feb 15, 2011, EDGEWATER RECEIVES 90 YEAR MINING LEASES FOR CORCOESTO GOLD PROJECT, GALICIA, SPAIN

You can return to the main News Releases page, or press the Back button on your browser.